Renovations

Guides

Aerial view of downtown Burlington and its lakefront park on Lake Ontario

Burlington renovations

Kitchen and bathroom renovations in Burlington

Kitchen and bathroom renovations in Burlington are permitted by the City of Burlington, which accepts building permit applications only electronically, by email, under Building Permit By-law 030-2026. Nearly half of Burlington's occupied homes (47% in the 2021 census) were built before 1981, so many projects open older walls, drains and ductwork. Since the 2014 flood, the City has also waived the permit fee for backwater valves, sump pumps and sanitary line repairs done with a valve, which makes a basement bathroom the natural moment to add flood protection.

By the Purple Kitchen & Bath team · Updated · 4 min read · Photo: iStock

Nearly half of Burlington's homes were built before 1981

Burlington did much of its building early. Of 73,180 occupied dwellings in the 2021 census, 10,220 dated from 1960 or before and 24,485 from 1961 to 1980, together about 47%. Only 2,855 were built between 2016 and 2021. The city also has a large apartment stock: 12,830 homes, about 18%, are in buildings of five or more storeys, and another 13,725 are row houses.

Those numbers shape both rooms. A kitchen in a 1960s or 1970s house may be a closed room with a bearing wall between it and the dining room, and a bathroom of that era may sit on original drains and venting. Test for hazardous materials before demolition (see asbestos and lead in older homes). In condo towers, the condominium corporation's rules come first; the guide to condo renovation rules in Ontario explains what a board can require.

How the City of Burlington takes a renovation permit

Burlington's permit process runs by email. You confirm any zoning, site plan or grading clearances first, prepare the drawings to the City's Electronic Building Permit Application Submission Standards, and email the package with the subject line "Building Permit Application" plus the address. Packages over 20 MB need a large file transfer, which you request by email. The City replies with the fee, which it asks you to pay within two days, and issues the permit once everything is complete. The City's eCheck tool lets you check zoning and building rules before you apply.

Burlington's residential interior renovation checklist, applied to a kitchen or bathroom
ItemWhen it is needed
Provincial application form, plus designer schedules with BCIN numbersEvery application
Floor plans with room names, dimensions, and the size, spacing and direction of framing, beams and columnsEvery application
Plumbing Sizing formIf applicable, typically when fixtures are added or moved
HVAC plans and ventilation calculationsWhen ducts, equipment or ventilation change
ElevationsOnly if work leaves the building envelope or adds a new exterior opening
Private sewage system evaluation, with a separate permit for alterationsHomes on a septic system

Burlington kitchens: walls, windows and the new heritage district

Opening a kitchen in an older Burlington house is a structural job, and the City's checklist asks for framing direction and beam information on the floor plans for exactly that reason. Plan the beam, the ductwork that runs through the wall and the hood vent together; the guide to removing a load-bearing wall shows the sequence.

Heritage adds a second layer for some houses. In March 2026, Council approved the plan and guidelines for the Burlington Avenue and Ontario Street Heritage Conservation District, and owners of designated properties need a heritage permit for changes that could affect protected heritage qualities. The City's Heritage Grant Program offers grants and loans of up to 50% of eligible costs, to $15,000, for conserving features named in a designation by-law. It does not pay for new plumbing, electrical or heating, or for structural work such as a new beam over a patio door opening, so a kitchen rebuild is funded the usual way.

Bathrooms and basements: Burlington's flood programs

Burlington's basement flooding history makes a below-grade bathroom a two-part project: the bathroom, and the protection around it. The City and Halton Region each run programs, and the City lists both on its flood prevention page.

  • Between 2014 and 2024 the City waived $567,000 in permit fees under the grant.
  • For a sump pump, the City's Engineering Services reviews where the water will discharge, through a site visit.
  • The layout, drainage and headroom of the bathroom itself are covered in the basement bathroom renovation guide.
Flood programs open to Burlington homeowners
ProgramRun byWhat it covers
Plumbing Permit Fee GrantCity of BurlingtonNo permit fee for a backwater valve, a sump pump, or sanitary line repair with a backwater valve; one application can cover all three
Home Flood Protection ProgramCity of BurlingtonA third-party assessment at half price: $285 + HST in person or $240 + HST virtual, 20 a year
Enhanced Basement Flooding Prevention SubsidyHalton RegionBackwater valves, downspout and weeping tile disconnection with a sump pump, sewer lateral lining and repair, exterior storm drain disconnection
Household Drainage SurveyHalton RegionAn in-home drainage assessment for houses built from the mid-1950s to the late 1970s with reported flooding from a wastewater surcharge, in Region priority areas

One team for the permit, the build and the inspections

Renovating in the GTA since 1996, Purple Kitchen & Bath keeps design, product selections, permits, inspections and the build with one team, and can also work with a designer you have already hired. A free consultation opens each project; a walkthrough of the finished rooms closes it and starts the one-year workmanship warranty. Plan on about 6 to more than 16 weeks, driven by the scope, the complexity and any changes, and in a condo tower the building's own rules and schedule shape the timeline too.

Questions

Can I drop off a Burlington building permit application in person?

No. The City accepts building permit applications only through electronic submission, sent by email with the project address in the subject line.

Does Burlington charge a permit fee for a backwater valve?

No. Under the Plumbing Permit Fee Grant Program, the City does not charge the building permit fee for a backwater valve, a sump pump, or a sanitary line repair done with a backwater valve. You still need the permit.

My 1960s Burlington house has flooded before. Is there help with the basement?

You may qualify for Halton Region's Household Drainage Survey if the house was built between the mid-1950s and late 1970s, has a reported history of basement flooding from a wastewater surcharge and sits in a Region priority area. Otherwise, a licensed plumber's assessment can count toward the Region's subsidy limits.

Will the Heritage Grant Program help pay for a kitchen in a designated house?

Not for the kitchen itself. The grants and loans cover conservation of heritage features named in the designation by-law, and the City excludes new services such as plumbing and electrical and structural work for modern renovations.

Sources and further reading

  1. City of Burlington: Applying for a building permit
  2. City of Burlington: Residential housing interior renovations, permit checklist
  3. City of Burlington: Home flood prevention
  4. City of Burlington: Municipal cultural heritage register and heritage conservation district
  5. Statistics Canada: Census Profile, 2021, Burlington (period of construction)

Checked November 22, 2026. Codes, by-laws, prices and product specifications change; confirm with your municipality, condo corporation or supplier before you build.

Plan your bathroom renovation

Initial consultations are complimentary. Jordan Duda, our client care and lead estimator, is usually your first point of contact.